Want a rough cost for your design first? Try Instant Pricing — an AI cost estimate →

01 / Show facts

Show facts.

Show
MacTech Egypt 2026 — the 26th international exhibition
Dates
17–20 December 2026
Organiser
IFG – International Fairs Group
Sector
Metal forming and working, CNC machinery, sheet-metal working, industrial and hand tools, welding and cutting equipment, automation and production technology
Audience
Trade professionals only — Egypt, Africa and the Middle East
Venue
Egypt International Exhibition Center (EIEC), Al-Mushir Tantawi Axis, Fifth Settlement, New Cairo
Confirmed on the organiser’s official website (mactech-eg.com). Always confirm details with the organiser before booking.

Source: organiser website mactech-eg.com (official site). Last updated: 25 September 2026.

02 / What exhibitors need

Built for this floor.

Built around the machine, not the graphics. A CNC line or press brake arrives on a fixed delivery slot and cannot be moved twice. We engineer the platform, the power and the safety perimeter from the machine’s spec sheet, coordinate access routes and floor-loading limits with the show management at EIEC, and install once the machine is positioned.

01

Steel platforms and load distribution

Fabricated steel platforms that spread the point loads of heavy machines across the hall floor, engineered from each machine's weight and footprint.

02

Floor-loading limits and entry routes

We coordinate with the show management on EIEC's floor-loading limits and the machine entry routes, so the platform and the delivery plan fit the hall before build-up.

03

3-phase power and compressed air

Three-phase power drops and compressed-air lines planned into the stand for live running demonstrations, sized to each machine's rated load.

04

Safety barriers and machine enclosures

Guard barriers and enclosures around running machines, so visitors can watch cutting, forming and welding demonstrations from a safe distance.

05

Swarf and oil containment, raised floors, cabling

Trays and bunds that contain swarf and oil, raised floors that hide cabling, and routed cable paths that keep walkways clear.

06

Overhead banners and identity fronts

Overhead banners and branded fronts sized for large floor areas, readable across the hall above the machines.

07

Installation, dismantling and storage

Installation once the machine is in position, dismantling after the show, and storage of platforms and enclosures for the next edition.

03 / Our services

Everything under one roof.

01

Custom stands

Design-and-build stands for machinery exhibitors, from a single-machine platform to a multi-machine line with a meeting area.

02

Re-installation of existing stands

We inspect, re-weld, repaint and re-install platforms and enclosures you already own, with branding refreshed for the new edition.

03

Country pavilions

Group pavilions for national machinery associations and manufacturer delegations, with one platform per company under shared branding.

04

Signage & large-format print

Overhead banners, hanging signs and wall-scale graphics printed in our own large-format facility.

05

3D fiberglass props

Custom brand props and scale pieces fabricated in-house to sit beside the machines.

06

On-site installation & dismantling

Our own crews install after the machine is positioned, adjust on site and dismantle after the show, within EIEC’s build-up rules.

07

Storage between editions

Secure storage for platforms, barriers and enclosures between editions.

Quote request

Request a quote for your stand at MacTech Egypt 2026

Choose fileNo file chosen
PDF or images, up to 10 MB
04 / Plan early

Your countdown to
build-up day.

Steel platforms and safety enclosures need engineering before fabrication. Standard fabrication needs 30+ days from approved brief; send the machine weight, footprint and power rating early so the platform design is locked before the machine ships.

•
8 weeks out

Ideal start: concept, plans, quotation

•
30+ days

Minimum production lead time from approved brief

•
As little as 7 days

Rush builds when the factory schedule allows

•
Build-up week

Delivery, installation, electrics, handover

Stands we built.

Real photos of stands we fabricated and installed with our own crews at Cairo shows.

EGS stand at EGYPES, side view — built by The Task
EGS stand at EGYPES, side view
National Bank of Egypt stand with LED wall — built by The Task
National Bank of Egypt stand with LED wall
El Sabah stand during build-up — built by The Task
El Sabah stand during build-up
IRSC stand detail at EGYPES — built by The Task
IRSC stand detail at EGYPES

See all exhibition projects →

05 / FAQ

FAQ MacTech Egypt

Do you handle platforms that carry machines weighing several tonnes?

Yes. We engineer each steel platform from the machine's weight and footprint and spread the load across the frame, then confirm it against the hall's floor-loading limits with the show management before build-up. Send the spec sheet and we confirm the design.

Can you provide 3-phase power and compressed air for live running demos?

Yes. We plan three-phase power drops and compressed-air lines into the stand, sized to each machine's rated load and routed under raised floors or cable trays. Live demonstrations also need the organiser's approval, which we request together with your drawings.

Can you build directly from the foreign manufacturer's drawings?

Yes. Foreign manufacturers usually send a platform or stand drawing. We review it for buildability and weight, flag what has to change for EIEC's rules, price it, fabricate locally and install on site — or work white-label behind your agency.

Your Turnkey Production & Fabrication Partner.

Book your stand for
MacTech Egypt.

Send your stand area and brief. We reply within 24 hours with scope, timeline and pricing within your project budget.

Download our events & exhibitions portfolio (PDF)

58 El Hegaz St. (Borg Laoun, Heliopolis Sq.), El Nozha, Cairo