01 / Show facts

Show facts.

Show
HACE - Hotel Expo
Dates
19–21 Oct 2026
Organiser
EGM – Egyptian Marketing Group
Sector
Hospitality / Catering equipment
Venue
Egypt International Exhibition Center (EIEC), New Cairo
Confirmed on the NCIEC agenda 2026. Always confirm details with the organiser before booking.
This show starts soon. Rush builds are possible in as little as 7 days when the factory schedule allows. Send your area and files now and we confirm feasibility within 24 hours.

Source: NCIEC official monthly agendas (nc-iec.com/agenda.php). Last updated: 22 September 2026.

02 / What exhibitors need

Built for this floor.

Why exhibitors choose a local production partner. Kitchen and catering equipment is heavy, needs power and plumbing points, and looks best when shown running. A local production partner plans the utility points into the stand from day one, builds display counters that can carry the equipment safely, and finishes the stand to hospitality-grade standard rather than a generic trade-show look.

01

Live-demo kitchen stations

Working kitchen and prep counters with planned power, water and ventilation points so equipment can be demonstrated running, not just displayed cold.

02

Heavy equipment display stands

Reinforced platforms and counters engineered for the weight of ovens, fridges and catering units, with safe access for buyers to inspect them closely.

03

Premium hospitality finishes & signage

Materials and illuminated signage that read as hospitality-grade — the same finish quality your equipment will sit in inside a real hotel or restaurant.

03 / Our services

Everything under one roof.

01

Custom stands

Design-and-build stands sized to your area, from compact booths to multi-room pavilions.

02

Re-installation of existing stands

We inspect, refurbish and re-install stands you already own, with graphics refreshed for the new edition.

03

Country pavilions

Group and national pavilions with individual counters and shared branding.

04

Signage & large-format print

Backlit walls, hanging signs and wall-scale graphics printed in our own facility.

05

3D fiberglass props

Custom sculptural pieces and brand props fabricated in-house.

06

On-site installation & dismantling

Our own crews install, adjust on site and dismantle after the show.

07

Storage between editions

Secure storage of your structure so it is ready for the next show.

04 / Plan early

Your countdown to
build-up day.

A typical production runway. Standard fabrication needs at least 30+ days from approved brief to delivery. The earlier we start, the more schedule freedom you keep.

8 weeks out

Ideal start: concept, plans, quotation

30+ days

Minimum production lead time from approved brief

As little as 7 days

Rush builds when the factory schedule allows

Build-up week

Delivery, installation, electrics, handover

05 / FAQ

FAQ HACE - Hotel Expo

Can the stand include a working demo kitchen?

Yes. We plan power, water and ventilation points into the layout for live cooking or food-prep demonstrations. Gas and fire-safety requirements are confirmed with the organiser before design.

HACE starts soon. Is there still time to build a stand?

Rush builds can be delivered in as little as 7 days when the factory schedule allows. Send your equipment list, stand area and files now and we confirm feasibility within 24 hours.

Can you build display stands that carry heavy kitchen equipment?

Yes. We engineer platforms and counters for the equipment weight you give us, with safe clearances for buyers to inspect and staff to operate them during the show.

Your Turnkey Production & Fabrication Partner.

Book your stand for
HACE - Hotel Expo.

Send your stand area and brief. We reply within 24 hours with scope, timeline and pricing within your project budget.

Download our events & exhibitions portfolio (PDF)

65 El Nasr St., Gesr El Suez, Cairo