Stand Design & Build for Food Africa + interpack MEA 2026
Food Africa and interpack MEA share the halls, so the floor mixes food producers with packaging and processing machinery. Food stands need sampling counters that stay clean and busy, and machinery stands need platforms strong enough to carry the equipment.
Your Turnkey Production & Fabrication Partner.
Show facts.
- Show
- Food Africa + interpack MEA
- Dates
- 7–10 Dec 2026
- Organiser
- IFP Egypt / Messe Düsseldorf
- Sector
- Food & Beverage / Packaging
- Venue
- Egypt International Exhibition Center (EIEC), New Cairo
Source: NCIEC official monthly agendas (nc-iec.com/agenda.php). Last updated: 22 September 2026.
Built for this floor.
Why exhibitors choose a local production partner. Food exhibitors ship products, samples and cold-chain items on a fixed date. A local partner plans power and storage for refrigeration into the build, receives your goods and keeps the stand stocked on show days.
Tasting & sampling counters
Easy-clean counters with sinks or wipe-down surfaces, prep space and concealed storage for samples.
Refrigeration-ready layouts
Power points, ventilation gaps and floor plans that make room for display fridges and freezers.
Machinery plinths & packaging walls
Load-rated plinths for packaging and processing machines, plus walls that show packed product lines.
Everything under one roof.
Custom stands
Design-and-build stands sized to your area, from compact booths to multi-room pavilions.
Re-installation of existing stands
We inspect, refurbish and re-install stands you already own, with graphics refreshed for the new edition.
Country pavilions
Group and national pavilions with individual counters and shared branding.
Signage & large-format print
Backlit walls, hanging signs and wall-scale graphics printed in our own facility.
3D fiberglass props
Custom sculptural pieces and brand props fabricated in-house.
On-site installation & dismantling
Our own crews install, adjust on site and dismantle after the show.
Storage between editions
Secure storage of your structure so it is ready for the next show.
Your countdown to
build-up day.
A typical production runway. Standard fabrication needs at least 30+ days from approved brief to delivery. The earlier we start, the more schedule freedom you keep.
Ideal start: concept, plans, quotation
Minimum production lead time from approved brief
Rush builds when the factory schedule allows
Delivery, installation, electrics, handover
FAQ Food Africa + interpack MEA
Can the stand include cooking or tasting stations?
Yes. We build counters and prep areas for tasting. Cooking demos depend on the organiser's fire and safety rules, which we check with you before design.
Can you handle heavy packaging machinery on the stand?
Yes. We engineer plinths for the machine weight you give us. Confirm hall floor-load rules with the organiser and we build to them.
How early should we book for the 7–10 December dates?
We recommend at least 30 days of production lead time, ideally 8 weeks. December is busy in our factory calendar with several shows in mid-month.
Book your stand for
Food Africa + interpack MEA.
Send your stand area and brief. We reply within 24 hours with scope, timeline and pricing within your project budget.
Download our events & exhibitions portfolio (PDF)
65 El Nasr St., Gesr El Suez, Cairo